
Add to Cart
A pressure gauge should be installed on the pump discharge, and a high-low pressure alarm system should be utilized to address problem conditions that could lead to pump failure.
It is recommended that a pressure gauge be installed at the pump suction, and a lowsuction pressure alarm be mounted in the suction line.
However, do not install any metering device that causes a flow restriction on the suction piping. For full operating instructions and guidelines for this equipment, see the documentation provided by the manufacturer.
Ensure a pressure gauge is installed at the suction point, preferably with a thermometer and a low-pressure alarm.
Check the pressure gauges on the external lube oil filter (if utilized). If the differential between the gauges is greater than 15 psi when the pump is at operating temperature, clean the strainer and strainer magnets.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
| |||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
| |||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L |
|
|
|
|
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 |
|
|
|
|
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 |
|
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT |
|
|
|
|
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 |
|
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 |
|
|
|
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
More customer view:76-OILWELL A-1400-PT PUMP-yindapump.com.pdf