
Add to Cart
Liner Lock Ring, Mud Pump Fluid End AH1301010518 RS11309.05.019 GH3161-05.20 GH3101-05.04 mud pumps for drilling rigs
Liner Lock Ring was used in Mud Pump Fluid End.
Install the cylinder liner sealing ring into the counterbore of the hydraulic cylinder. Install the wear plate into place through stud bolts. Then install the cylinder liner flange, apply Le Tai glue 277 to the inner hole of the nut, and tighten the nut.
Install the cylinder liner sealing ring, apply grease to the inner surface of the cylinder liner gland, and then sleeve onto the cylinder liner. Install cylinder liner locking ring and O-ring. Apply grease to the threads of the cylinder liner gland, spin the cylinder liner into the cylinder liner flange, and knock it tight. Then fit the clamp. Install mudguards before installing clamps.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
| |||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
| |||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L |
|
|
|
|
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 |
|
|
|
|
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 |
|
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT |
|
|
|
|
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 |
|
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 |
|
|
|
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
More customer view:39-Emsco FB1600 Pump fluid-yindapump.com.pdf